Construction
St. Elizabeths East - Historic Building 88 Relocation & Preservation
Preservation-focused relocation of Historic Building 88 at St. Elizabeths East, including stabilization, abatement, foundation work, building movement, roof restoration, utility improvements, and associated site work.
Project Overview
The Historic Building 88 project at St. Elizabeths East focuses on carefully preparing, stabilizing, and relocating a historic structure as part of a broader preservation effort.
The planned scope includes selective demolition and abatement, structural stabilization, foundation work, and the controlled movement of the existing building. Additional activities include reconstruction of the building connector, roof restoration, utility work, and associated site improvements needed to support the relocation and long-term preservation of the structure.
Project Details
Key Features
Historic Building Relocation
Planned controlled relocation of the existing historic structure as part of the broader preservation strategy.
Structural Stabilization
Stabilization measures designed to protect the building before and during relocation activities.
Selective Demolition & Abatement
Targeted demolition and abatement work to prepare the structure for stabilization, movement, and restoration.
Foundation Preparation
Foundation work required to receive and support the relocated building.
Connector Reconstruction
Reconstruction of the building connector following relocation and placement of the historic structure.
Roof Restoration
Restoration and reinstallation of roof components as part of the preservation and building-envelope scope.
Utility Improvements
Utility work coordinated with the building relocation and final site configuration.
Site Improvements
Grading, access, stormwater, and other supporting site improvements associated with the relocation and preservation effort.
Related Projects
ConstructionKC Lewis Elementary School Swing-Space Renovation
Washington, DCRenovation and modernization of an existing school building for DCPS swing-space use, including learning areas, an electric kitchen, roof and window replacement, playground improvements, and technology and infrastructure upgrades.
ConstructionEmery Education Campus HVAC & Electrical Upgrades
Washington, DCModernize an existing school facility with a geothermal HVAC upgrade, electrical improvements, elevator and fire alarm upgrades, and related interior work.
Fredericksburg National Cemetery - Historic Masonry Wall Restoration
Fredericksburg, VARepair and restoration of the historic masonry boundary wall at Fredericksburg National Cemetery.
Let's Build Your Next Project Together
From concept to closeout, our team delivers construction, environmental, compliance, and facility maintenance solutions you can rely on.