Oxon Run Outdoor Fitness Park Construction & Site Improvements
Construction of an outdoor fitness park featuring exercise equipment, safety surfacing, shade structures, pathway connections, and supporting site and stormwater improvements.
Project Overview
The Fitness Park Construction and Site Improvements project delivered a fully equipped outdoor fitness area designed to support recreation, physical activity, and community use.
The project included installation of Greenfields fitness equipment or approved equivalents, concrete equipment footings, and poured-in-place safety surfacing to create a durable and user-friendly exercise environment. Sunshades approved by the Department of General Services (DGS) and the Department of Parks and Recreation (DPR) were also installed to improve comfort for park users.
Supporting site improvements included grading, stormwater management, erosion and sediment control, and connections to the existing pathway system. Together, these improvements created a more accessible and functional outdoor fitness destination integrated into the surrounding park environment.
Project Details
Key Features
Outdoor Fitness Equipment
Furnishing and installation of Greenfields fitness equipment or approved equivalents to support a range of outdoor exercise activities.
Concrete Equipment Foundations
Concrete footings installed to provide stable, durable support for fitness equipment.
Poured-in-Place Safety Surfacing
Resilient safety surfacing installed throughout the fitness area to improve user comfort and protection.
Shade Structures
DGS- and DPR-approved sunshades installed to provide shade and improve user comfort.
Site Grading & Preparation
Grading and site preparation performed to support the fitness park layout and associated improvements.
Stormwater Management
Site improvements incorporating stormwater-management measures to support drainage and environmental performance.
Erosion & Sediment Control
Erosion and sediment controls implemented during construction in accordance with project requirements.
Pathway Integration
The fitness area connected to the existing pathway system to improve access and circulation throughout the park.
Related Projects
ConstructionKC Lewis Elementary School Swing-Space Renovation
Washington, DCRenovation and modernization of an existing school building for DCPS swing-space use, including learning areas, an electric kitchen, roof and window replacement, playground improvements, and technology and infrastructure upgrades.
ConstructionEmery Education Campus HVAC & Electrical Upgrades
Washington, DCModernize an existing school facility with a geothermal HVAC upgrade, electrical improvements, elevator and fire alarm upgrades, and related interior work.
St. Elizabeths East - Historic Building 88 Relocation & Preservation
Washington, DCPreservation-focused relocation of Historic Building 88 at St. Elizabeths East, including stabilization, abatement, foundation work, building movement, roof restoration, utility improvements, and associated site work.
Let's Build Your Next Project Together
From concept to closeout, our team delivers construction, environmental, compliance, and facility maintenance solutions you can rely on.